Compliance · PTI and GS1 labels

PTI case labels, and the records behind them

PTI says its case-level rules cover 90 to 95% of FSMA 204. The rest is linking harvest, packing and shipping to the lot on the label. LOT AXIS prints the GS1 label and records each step against the same lot.

Harvest ticket on field bins
One lot, field to truck
Harvest and field on the receipt
Pack-out lot assigned
GS1-128 case label printed
Cases scanned onto the truck
The lot on the label is the lot in the record
The rule in brief

What PTI and GS1 ask for, in plain English

The Produce Traceability Initiative is voluntary and industry-built. Buyers treat it as required.

Who

Produce packers and shippers

Anyone packing or shipping fresh produce to North American retail and foodservice. Most buyers expect PTI labels on every case.

What

GTIN plus lot on every case

A GS1 company prefix, a GTIN for every case configuration, and a GS1-128 barcode with the GTIN and batch/lot, plus human-readable text on each case.

The milestones people skip

Scan in, scan out

PTI milestones 6 and 7: read and store the GTIN and lot from every case received and every case shipped. Printing a label is not enough.

90–95%PTI's own estimate of how much of FSMA 204's case-level traceability it already covers. The new parts are the lot code source and the field, harvest and cooling records.
Requirement by requirement

What PTI and GS1 ask for, and where LOT AXIS does it

The PTI milestones and the FSMA 204 pieces that sit around the label.

What the rule asks for
How LOT AXIS covers it

GTIN and lot on every case

A GS1-128 barcode carrying AI (01) GTIN-14 and AI (10) batch/lot, with human-readable text.

PTI milestones 3–5

✓PTI and GS1 case labels print at the line from the lot record, with the GTIN and lot in the barcode. Nobody types a lot number.

Pack or use-by date

Usually AI (13) pack date or AI (15) use-by date alongside the GTIN and lot.

PTI label guidance

✓Pack date comes from the station clock and goes on the label and into the lot record at the same time.

Field, harvest and cooling records

For FSMA 204: field name, harvest date, cooling location and date, linked to the lot you pack.

21 CFR 1.1330

✓Grower, field and harvest date are recorded when bins are received, and carried to every pack-out lot made from them.

Read and store on receipt

Scan and store the GTIN and lot of every case you receive.

PTI milestone 6

✓Inbound cases are scanned at receiving, so their GTIN and lot become part of your inventory and trace.

Read and store on shipment

Scan and store the GTIN and lot of every case you ship.

PTI milestone 7

✓Every case is scanned onto the load. Bills of lading and packing slips come from the scans, and every lot is linked to its customer.

Sortable records in 24 hours

For FSMA 204 foods, records to FDA within 24 hours, as a sortable spreadsheet when asked.

21 CFR 1.1455

✓Enter any lot and run the full trace report: one lot, every grower, every customer.

See it in the software

What it looks like in LOT AXIS

Real LOT AXIS screens and reports, shown with sample data.

LOT AXIS PTI case label with GTIN, lot and pack date, voice pick code, and SSCC pallet label (sample data)
Click to enlarge

The label carries the lot

GTIN, lot and pack date come from the lot record, so the label and the data always match.

LOT AXIS production station with attribute tiles and the bin label printed from the record (sample data)
Click to enlarge

Captured at the station

One tap per attribute at the production station. The record is on screen, and the bin label prints from it.

LOT AXIS FSMA 204 Chain of Custody report pages: backward trace, forward trace, still in inventory (sample data)
Click to enlarge

Hand over the record

From any case lot, run the trace report: every grower and field behind it, every customer after it.

Questions

PTI and GS1 questions we hear most

We already print PTI labels. What changes?

Usually nothing on the label. The gap is recording the GTIN and lot on every case received and shipped, and linking harvest and field data to the pack-out lot.

Does FDA require the lot code on the label?

No. FDA does not require the traceability lot code on the package. The produce industry's convention is GTIN plus lot on the PTI label, and buyers expect it.

Do we need our own GS1 company prefix?

Yes, for PTI. GTINs are built from your GS1 US company prefix, with one GTIN for each case configuration you ship.

When does FSMA 204 take effect?

FDA cannot enforce the rule before July 20, 2028. Most retailers will ask for the data well before then.

What does a demo look like?

Bring one pack-out lot. In 30 minutes we follow it from field bins to the truck in LOT AXIS and show you the label and trace that come out.

Reading

Go deeper

Plain-English guides from the LOT AXIS Knowledge Center.

PTI · FSMA 204

You May Already Be Most of the Way There: PTI Labels and FSMA 204

Read
GS1-128

The Case Label That Survives the Whole Supply Chain

Read
Initial packing

Harvest to Pack: Getting the Initial Packing KDEs Right the First Time

Read

General information, not legal advice. Confirm label requirements with your customers, GS1 US and current PTI guidance, and FDA obligations against 21 CFR Part 1 Subpart S.

Bring one pack-out lot. We'll trace it field to truck.

In a 30-minute demo we follow a real lot from field bins to your customers and show you the label and the trace.

Scroll to Top